At our Warminster ready meal production unit we have installed a 300 kWp (kilo watt peak)  solar system which went operational in  September 2021. So far this has generated 55 MWh (megawatt hour) and saved 14 metric tons of CO2 emissions which is the equivalent of planting 640 trees.  Over the 25 year predicted life […]